Sterlco SPV Remote Proportioning Devices User Manual

Page 12

Advertising
background image

Remote Proportioning Valve

Chapter 3: Installation

12 of 28

Machine-Mount Installation

In this installation, the SPV is mounted directly to the material inlet of the hopper loader or
vacuum hopper it will serve. The hopper loader or vacuum hopper inlet tube provides the
support for the SPV.

WARNING!

Make sure that the hopper loader or vacuum hopper inlet can support the
weight of the SPV (approximately 10 lbs.) and any unsupported material
supply hose. A properly-installed hopper loader or vacuum hopper can
support 250 lbs. of downward force. If you are installing your SPV on
equipment from another manufacturer, consult them for advice on support
capabilities.

1. Check the SPV single outlet tube diameter and the hopper loader inlet size to be sure

you have the necessary coupler and transition tube (if needed) to connect the SPV to
the hopper inlet.

2. Chamfer and smooth the hopper loader or vacuum hopper inlet tube to prevent

damage to the O-rings inside the tube coupler.

3. Apply silicone lubricant or equivalent to the inside of the tube coupler to ease

insertion.

4. Insert the single material outlet tube into the tube coupler past the O-ring. Be careful

to avoid damaging the O-ring.

5. Slide the SPV onto the hopper loader or vacuum hopper with a side-to-side motion.

Be sure the tube passes the O-ring for an air-tight seal. Avoid damaging the O-ring.

6. Tighten the set screws in the tube coupler to lock the SPV in place.

7. Attach the material pick-up wands to the SPV inlet tubes using flex hose and hose

clamps. Route the material conveying hoses so they don't interfere with workspace or
create a tripping hazard.

Advertising