1 work rules, 2 tools & equipment needed, 3 safety considerations – Sterlco SSC Conveying Systems User Manual

Page 12: 4 general responsibility, 2 safety

Advertising
background image

Page 11 of 38

2 Safety

2-1 Work

Rules

The installation, operation, and maintenance of this
equipment must be conducted in accordance with all appli-
cable work and safety codes for the installation location. This
may include, but is not limited to OSHA, NEC, CSA, SPI,
and any other local, national, and international regulations.

;

Read and follow these operating instructions when
installing, operating, and maintaining this equipment. If
the instructions become damaged or unreadable,
additional copies are available from Sterling.

;

Only qualified personnel familiar with this equipment
should work with this system.

;

Work only with approved tools and devices.

;

Disconnect and lock out power while working on this
equipment.

2-2 Tools and Equipment Needed

These tools and equipment are necessary for installation:

;

Hand tools.

;

Wire, conduit, and fittings for wiring runs.

;

Anchor bolts with nuts and washers or red head-type
anchors.

2-3 Safety Considerations

The terms NOTICE, CAUTION, WARNING, and DANGER
have specific meanings in this manual.

NOTICE is used to indicate a statement of company policy
directly or indirectly related to the safety of personnel or
protection of property.

CAUTION indicates a potentially hazardous situation which,
if not avoided, may result in minor injury.

WARNING indicates a potentially hazardous situation which,
if not avoided, could result in death or serious injury.

Advertising