Powering on and off – HP Cisco MDS 9124e Fabric Switch for BladeSystem c-Class User Manual

Page 32

Advertising
background image

Managing the Switch

32

7.

Create an admin password when prompted by the switch.

8.

Continue with the setup configuration and enter the appropriate information that matches the

Cisco MDS 9124e Switch that you removed.

9.

Install the same Cisco MDS SAN-OS release as was installed on the Cisco MDS 9124e Switch

that was removed. Refer to the

Cisco MDS 9000 Family Fabric Manager Configuration Guide

and the

Cisco MDS 9000 Family CLI Configuration Guide

for installation instructions.

10.

I

f Cisco MDS SAN-OS licenses were installed on the Cisco MDS 9124e Switch that was

removed, install the appropriate licenses on the replacement switch.

11.

If you want all ports to be shut when restoring the switch configuration, edit the last backed up

switch configuration file and change all the interface ports to shutdown. For example:
switch# interface bay1

switch# port-license acquire

switch# no shutdown <- change to shutdown

12.

Save the switch configuration file after making your edits.

13.

Restore the switch configuration from the remote server.

14.

Verify that all ports acquire a license, using the following command:
switch# show port-license

15.

I

f all ports have not been acquired, acquire them. Refer to the

Cisco MDS 9000 Family Fabric

Manager Configuration Guide

and the

Cisco MDS 9000 Family CLI Configuration Guide

for

instructions.

16.

Reset the SNMP admin password to enable Device Manager and Fabric Manager SNMP login.

Refer to the

Cisco MDS 9000 Family Fabric Manager Configuration Guide

and the

Cisco MDS

9000 Family CLI Configuration Guide

for instructions. The following example shows the CLI

commands:
switch# config t

switch(config)# snmp-server user admin auth md5 new password

switch(config)# do copy running-config startup-config

17.

Connect all external fibre channel cables in the same port location as before. All interfaces

should remain in the shutdown state until you re-enable them on the switch using the no
shutdown

command.

18.

Verify that the switch successfully joins the fabric.

Powering on and off

Cisco MDS 9124e Switch power is provided by the enclosure. The switch will run the Power-On Self

test (POST), a series of diagnostic tests run by a switch after it is powered on, by default each time

power to the enclosure is turned on. The POST process can last as long as three minutes.
To remove power from the switch, remove it from the enclosure interconnect bay.

NOTE:

Each time the Cisco MDS 9124e Switch is powered on, its settings are restored to the

startup configuration.

Advertising