Scheduling tab – HP Integrity NonStop H-Series User Manual
Page 113
Advertising

Scheduling Tab
The Scheduling tab allows you to schedule when to run the build and apply steps. For Build, the
default is “Now” (upon submittal of the Build/Apply request), but you can also specify a later date
and time for the Build to begin. For Apply, the default is “As soon as the build completes,” but you
can also specify a later date and time to start the Apply process.
Initiate a Build/Apply Request
113
Advertising
This manual is related to the following products: