Installing a second serial port – HP ProLiant ML350 G4 Server User Manual

Page 77

Advertising
background image

Hardware Options Installation

77

2. Reverse step 1 to secure the cable management arm after the maintenance

procedures have been completed.

Installing a Second Serial Port

1. Power down the server ("Powering Down the Server" on page

25

).

2. Extend the server from the rack, if applicable ("Extending the Server from

the Rack" on page

26

).

3. Remove the front bezel, if applicable ("Removing the Front Bezel (Tower

Model)" on page

27

).

4. Remove the access panel ("Removing Access Panel" on page

27

).

5. Remove the expansion slot cover.

6. Install the serial port bracket and close the slot cover.

7. Connect the serial port cable to the serial port connector on the system board.

8. Replace the front bezel ("Removing the Front Bezel (Tower Model)" on page

27

), if applicable.

9. Replace the access panel ("Removing Access Panel" on page

27

).

Advertising
This manual is related to the following products: