Smart array controller cable options, Installing the mini-sas p222 cable in a 1u node – HP ProLiant SL210t Gen8 Server User Manual
Page 45

Hardware options installation 45
8.
Connect the 2U adapter cable to the GPU power cable.
9.
Install the node into the chassis ("
Installing a node into the chassis
" on page
10.
Connect all peripheral cables to the node.
11.
Power up the node ("
" on page
Smart Array controller cable options
NOTE:
For more information on cabling configurations, see Cabling (on page
Installing the Mini-SAS P222 cable in a 1U node
1.
2.
Disconnect all peripheral cables.
3.
Remove the node from the chassis (on page
4.
Remove the 1U cable guard (on page
5.
Remove the 1U air baffle (on page
6.
Remove the PCI riser cage (on page
7.
Disconnect and remove the Mini-SAS cable ("
" on page
8.
If not installed, install the P222 Smart Array controller into the PCI riser cage ("
" on page
9.
Connect the Mini-SAS cable x4 connector to the P222 Smart Array controller.