Full-height tape drive – HP ProLiant ML310 G5 Server User Manual
Page 35
Advertising
Hardware options installation 35
10.
Power up the server (on page
Full-height tape drive
For clarity, the following illustrations include option cabling only.
To install the component:
1.
Power down the server (on page
2.
).
3.
Remove the access panel (on page
4.
Remove the applicable media bay blanks ("
5.
Disengage the two wire supports inside the half-height drive bays.
6.
Install the tape drive:
a.
Open the upper and lower wire retainers.
b.
Install the full-height tape drive.
Advertising