GE 30 Electric Built-In Wall Ovens User Manual

Page 4

Advertising
background image

3

PEDESTAL RAIL INSTALLATION (30” DOUBLE OVENS ONLY)

A. Place one pedestal rail on each cabinet runner or centered on opposite side of solid cabinet bottom

flush with side of cabinet opening. Locate each rail so that front of rail is behind front cabinet

opening.

B. Drill pilot holes and attach rails to runner or bottom of cabinet with provided hardware.

Advertising
This manual is related to the following products: