Installation instructions, Step 7 install filters, Step 8 install implement rods – GE ZV48SSFSS User Manual

Page 15: Finalize installation

Advertising
background image

49-80151-8

15

Installation Instructions

STEP 7 INSTALL FILTERS

‡3ODFH¿OWHUGULSWUD\VLQWRWKHUHDURIWKHKRRG

‡,QVHUWWKHJUHDVH¿OWHULQWRWKHRSHQLQJDQGGURSLQWR

the trays.

‡7RUHPRYHWKH¿OWHUVJUDVSWKHKDQGOHSXVKWKH¿OWHU

up and lift out.

STEP 8 INSTALL IMPLEMENT

RODS

‡8VHDÀDWEODGHVFUHZGULYHUWRLQVWDOOVWDQGRIIVLQWRWKH

bottom of the hood.

• Align implement rod to stand-offs with the screw hole

towards the inside of the hood. Secure the rod to the
stand-offs with the supplied Allen wrench.

• Follow the same procedure on the opposite side.

Screw

Stand-offs

Into

Hood

Use Allen

Wrench to

Secure Rod

to Stand-offs

FINALIZE INSTALLATION

• Install the supplied infrared bulb(s).
• See the Owner’s Manual for instructions to test opera-

tion.

Advertising
This manual is related to the following products: