JELD-WEN JII041 W-4500 Folding Door Systems User Manual

Page 2

Advertising
background image

2

SAFETY

• Read and fully understand ALL manufacturers’ instructions before

beginning. Failure to follow proper installation and finishing
instructions may result in the denial of warranty claims for
operational or performance problems.

• Do not work alone. Two or more people are required. Use safe lifting

techniques.

• Use caution when handling glass. Broken or cracked glass can cause

serious injury.

• Wear protective gear (e.g. safety glasses, gloves, ear protection, etc.).
• Operate hand/power tools safely and follow manufacturer’s operating

instructions.

• Use caution when working at elevated heights.
• If disturbing existing paint, take proper precautions if lead paint is

suspected (commonly used before 1979). Your regional EPA (www.
epa.gov/lead) or Consumer Product Safety Commission offices provide
information regarding regulations and lead protection.

MATERIALS AND DOOR HANDLING

• Heed material manufacturers’ handling and application instructions.
• Protect adhesive surfaces from dirt, moisture, direct sunlight and

folding over onto themselves.

• Handle in vertical position; do not drag on floor.
• Do not put stress on joints, corners or frames.
• Store door in dry, well-ventilated area in vertical, leaning position to

allow air circulation; do not stack horizontally.

• Protect from exposure to direct sunlight during storage.
• Install only into vertical walls and when conditions are dry.

IF INJURY OCCURS, IMMEDIATELY SEEK MEDICAL ATTENTION!

FULLY SHEATHED AND OPEN-STUD WALL CONSTRUCTION

The door will be
mounted inside of the
rough opening. This
installation assumes
building wrap is
properly installed
prior to installation.

This installation guide specifically addresses masonry/block wall,
sheathed wall and open-stud construction.

MASONRY/BLOCK WALL CONSTRUCTION

This installation
assumes that a
building professional
has already properly
fastened and sealed
a framework of studs
(often called a buck)
to the concrete/
masonry wall.

Buck

Trimmer

studs

Header

Sheathing

Sill area

Building

wrap

King

stud

ROUGH OPENINGS

SAFETY AND HANDLING

MATERIALS AND TOOLS

#10 x 2.5"

#10 x 1"

#8 x 3/8"

#10 x 1.5"

#6 x 1"

PROVIDED MATERIALS

Note!

Specific parts shown are dependent upon product configuration

and every part will not apply to all configurations.
• #8 x 3/8" screws for cover plate
• #6 x 1" flat head screws for pivot hardware installation
• #10 x 1" screws for center wall pivot and housing
• #10 x 1 1/2" flat head screws to fasten hinges to panels
• #10 x 2 1/2" flat head screws for frame assembly and securing the

door frame (side jambs, head and sill track) into framing. If installing
the sill onto concrete, these screws will need to be replaced with
masonry fasteners. See the Needed Materials section for appropriate
fasteners to use in concrete.

ASSEMBLY AND INSTALLATION INSTRUCTIONS

for W-4500 Folding Door Systems (JII041)

Advertising