8install door - continued, Assembly and installation instructions – JELD-WEN JII041 W-4500 Folding Door Systems User Manual

Page 8

Advertising
background image

8

INSTALL DOOR - CONTINUED

6

INSTALL HARDWARE - CONTINUED

1. Remove hardware from bag. Match the hardware boxes to names on

the schematic. Arrange hardware so that it matches the hardware
layout within the schematic.

2. To avoid damage to the rollers, clean all debris from the head and

sill track.

3. Locate the cut out

near the end of the
sill track and insert
the properly handed
Directional Carrier
Set (two wheel) and/
or Intermediate
Carrier Set (one or
both dependent
upon configuration).
Carriers should be
positioned so that the
tapered wheels face
towards the interior
and the horizontal
wheels face towards
the exterior.

4. Insert the properly

handed pivot hinge.
Hinge should be
inserted so that the
heel, with the two
screw holes, is towards
the interior of the sill
track. Slide all the way
against jamb.

Secure the lower pivot

hinge to sill track with
two #6 x 1" screws.

Apply the aluminum

sill cover plate on top
of the lower pivot
hinge and secure with
two #8 x 3/8" screws.

5. Locate the cut out

near the end of the
head track and insert
the proper upper track
guide (as paired in the
box with the lower
track carrier set).

6. Install the properly

handed upper pivot
hinge. Align the metal
hinge plate with the
plastic housing and
secure the hinge to
upper track with four
#6 x 1" screws.

7. Press the weatherstrip

back into the head
track.

Cutout

Sill cover

plate

Cutout

Weatherstrip

Upper

track pivot

guide

Upper

pivot

hinge

Weatherstrip

Head

Exterior

Exterior

Exterior

Exterior

Four Wheel

Carrier set
shown

Pivot hinge

Sill

ASSEMBLY AND INSTALLATION INSTRUCTIONS

for W-4500 Folding Door Systems (JII041)

Advertising