Transporting, Operation hopper seed flow gate cleanout – Yetter 1310-010 Maximizer User Manual

Page 8

Advertising
background image

8

OPERATION

HOPPER SEED FLOW GATE
































CLEANOUT…

1. Close the seed box gate or hopper seed flow gate before the seeding implement is

full, so that the Maximizer belts are empty of seed before transporting.

2. Run the conveyor until all the seed that is on the belts has been transferred.

TRANSPORTING…

1. Lower the tube.
2. Shut off fuel supply.
3. Run engine empty of fuel.
4. Make sure all the lights and reflectors that are required by local highway authorities are in place, are clean and

can be seen clearly by all traffic.

5. Make sure the seed box gates are closed.
6. Make sure the seed boxes are securely seated and locked to the frame.
7. Lock conveyor in place.

Advertising