Mounting the steering box, Installing column, Installing steering shaft – Flaming River Nova Quick Ratio 1962-66 User Manual

Page 2: Warranty disclaimer

Advertising
background image


Mounting the steering box

IMPORTANT! Center the steering box before installation. Refer to Instruction Bulletin #1006
(enclosed) and follow the procedures to center the steering box’s sector (output) shaft.

1) Install the steering box-mounting plate by sliding the long stud through the frame rail
2) Place the 3” bolt through the frame rail from the inside
3) Slide the 3-1/2” bolt through the frame rail from the outside
4) Install the new steering gearbox to the three inner studs
5) Install all nuts/lock washers and torque to 40 ft-lbs.
6) Install the pitman arm to the sector shaft
7) Apply red threadlocker to the sector shaft threads. Torque pitman arm nut to 120 ft-lbs
8) Reattach the center link to the pitman arm. Install washer and nut. Tighten nut to 40-45 ft-

lb, install new cotter pin, and bend over ends.

Installing Column

1) Separate the billet dash mount bracket included in the kit into two pieces
2) Locate the 3/8” hole in the steel dash brace
3) Attach the dash mount bracket to the brace using the 3/8” X 2” bolt. Use the spacer washers

(supplied) to correctly position the bracket. Secure firmly, using the supplied 3/8” self-locking
(Nyloc) nut.

4) Attach the remaining section of the mounting bracket to the attached portion. Leave the

fasteners loose.

5) Slide the column into the aluminum mount bracket
6) Attach the OEM mounting bracket, using the original bolts.
7) Tighten the fasteners in the aluminum under-dash bracket.

Installing steering shaft

1) Install the lower u-joint (FR1925 — ¾ “-30 x ¾” DD) over the steering box input shaft.
2) On the tapered tongue shaft (the one with the hole in the tapered end, measure and mark

7/8” in from the square end. Mark with a permanent marker.

3) Insert the tapered “tongue” shaft into the hollow end of the steering column
4) Install the upper u-joint (FR1920 – ¾” DD x ¾” DD) onto the tongue shaft.
5) Measure and mark 7/8” in from the end of the DD shaft included in the kit. Use a permanent

marker.

6) Install the DD shaft included in the kit into each of the u-joints.
7) Position both shafts with the yoke shoulder at each mark. Tighten each setscrew to create a

mark on the shafts.

8) Remove the shafts and u-joints.
9) Using a ¼” high speed twist drill, dimple each setscrew mark
10) Install the original floor plate and install the new seal included with the kit using the original

screws.

11) Apply red threadlocker to all setscrews
12) Reassemble the shafts and u-joints, tightening the setscrews to 25 ft-lbs. Tighten all jam nuts.

NOTE: Front-end alignment by a service professional following installation is advised.

NOTE: Flaming River recommends periodic inspection of all u-joint setscrews for tightness.

Warranty Disclaimer

Because of their intended usage, the manufacturer makes no warranties whatsoever expressed or implied, oral or written,
to purchasers of their products regarding performance, safety, fit, merchantability, or length of service. Purchasers are
responsible for selection of proper goods and must rely on their own skill or judgment that such goods are suitable for the
purchaser’s application.

021805

Advertising