ページ9, For the technician for the user – GReddy Profec User Manual
Page 10

・Make sure that engine is cool when you begin the installation.
・ Make sure that hoses are long enough to reach valve unit, before you mount it.
・Before the installation, find the locations of wastegate, boost control solenoid
valve, fuel pressure regulator.
1. Display
2. SELECT switch
3. MODE switch
4. SET DIAL
Control unit
2
3
4
8
7
Power unit
5. Mounting flange
6. Main harness
7. Boost Pressure Sensor
8. Valve unit harness connector
1
5
6
Please read carefully
Product Description
Before Installation
Installation
Tools & Instruments
・Multi-meter (Over 15V measurement capability)
・Wire cutters
・ +Phillips and -Slotted Screwdrivers
・ Pliers
・10mm wrench
・Wire cutters
・ Soldering iron
・ Crimping tool
・Electrical tape
・Splice connectors
・ Soldering iron
・ Cable ties
For the technician
For the user
Please return this manual to the customer when installation and mounting are
completed.
When the person other than the owner uses a vehicle, please tell him/her that
Profec is installed and pass this instruction manual to the person.