GReddy INTERCOOLERS: Nissan 350Z 2002-06 / Type23R User Manual

Page 8

Advertising
background image

5. Front Bumper Modification

Trim the grill off and all the area that would contact the intercooler core.

6. Starting the Engine

(1) Refill the coolant and the power steering fluid to factory spec.

(2) Check all the hoses and wires connection, then reconnect the negative side

of the battery.

(3) Start the engine.

(4) Turn the steering wheel all the way left and all the way right. Fill the power

steering fluid if necessary.

(5) While idling, check for any oil, coolant, or air leeks.

(6) After inspection, reinstall the under cover and other stock parts that was

removed.

(7) After inspection, reinstall the under cover and other stock parts that was

removed.

(8) On the initial run, be sure to have a boost gauge to check the turbo-actuator

setting. This turbo kit is preset to boost between 0.6kg/cm

2

to 0.5kg/cm

2

.

It is very important that you monitor the boost pressure, and make sure not to
over boost. Over boosting can cause engine damage.

This completes the Intercooler Kit installation.

Advertising