Turbo kit installation – GReddy TURBO KITS: Mazda RX-8 2003 / T618Z User Manual

Page 9

Advertising
background image

3. Turbo Kit Installation

3-1 Intake Manifold Plate Installation

1. Remove the extension manifold (upper).

Please refer to RX8 workshop manual pages

01-13-4 to 01-13-11.

* Make sure to prevent any dirt or objects from

entering the intake manifold.

2. Install the Intake Manifold Blocking Plate onto

the manifold as shown in the picture.

(Parts Used #49)

3. Apply silicone gasket to the manifold surface

shown in the picture. Make sure the manifold

is clean before installing. You do not need to

apply silicone gasket to factory o rings.

Replace O rings if necessary.

4. Install extension manifold back onto intake

manifold. Refer to RX8 workshop manual.

3-2 Thermo Cloth Installation

1. Apply the provided Thermo Tape to the fire wall

around the exhaust manifold. (To secure the

Thermo Tape, Apply Aluminum tape on the

edges)

2. Bend and push the heat shield on the chassis

more against the body.

(Parts Used #51)

Caution!

It is very important to protect the parts surrounding the exhaust manifold and turbo from high

temperature. Improper installation of the thermo barrier may cause damage and fire.

Advertising