Chapter 3 operation, General, Chapter 3 – Vaisala RS92-SGP User Manual

Page 17: Operation

Advertising
background image

Chapter 3 ________________________________________________________________ Operation

VAISALA_______________________________________________________________________ 15

CHAPTER 3

OPERATION

This chapter contains information that is needed to operate this product.

General

It is essential that you carry out the pre-launch steps as instructed and
always in the same way. Follow the instructions in the sections below
and refer to

Appendix A on page 51

for proper and safe balloon

preparation.

The workorder for a sounding is as follows:

1.

Prepare the balloon and optional sounding accessories.

2.

Unpack the radiosonde.

3.

Prepare the sounding.

4.

Connect the battery.

5.

Launch the radiosonde.

6.

Monitor the sounding with the sounding system.

When conducting additional sensor soundings (ozone or radioactivity
soundings), follow the procedures and guidelines in the relevant User’s
Guides.

Advertising