Unloading and unpacking, Unpacking procedure, Storage information – Vaisala FD12P User Manual

Page 36: Unpacking procedure storage information

Advertising
background image

User's Guide _______________________________________________________________________

36

______________________________________________________ M210296en-A

For a modem and RS signal cable, use a screened, 2

× 0.22-mm²

twisted pair cable with a minimum diameter of 5 mm. For details, see
section Communication Options on page 50.

Unloading and Unpacking

The contents of the delivery in question are specified in the packing
list included with the delivery documents. The FD12P equipment is
normally delivered in three cases containing the following parts:

- Crossarm FDC115 containing the optics.
- Electronics enclosure FDB12 with radiation shield.
- Pole mast.

Two persons can easily move the cases from a truck to the installation
site.

NOTE

Handle gently the case containing the optical parts. Do not drop either
end of the case.

Unpacking Procedure

1.

Read the packing list supplied within the delivery documents.
Compare the packing list against the purchase order to make
sure that the shipment is complete.

2.

Open the covers.

3.

In case of any discrepancies or damage, contact the supplier.

4.

Place the packing materials and covers back in the cases and
store them for possible reshipment.

Storage Information

Store the FD12P in its packages in dry conditions, not in the open air.
The storage conditions are as follows:

- Temperature

−40 oC ... 70 oC.

- Relative humidity up to 95 %.

Advertising