Installation – Midco HMA-2 & HMA-2A Series User Manual

Page 11

Advertising
background image

Midco International Inc.

11

8471 34

Installation

___________________________________

Burner operation depends on the unit control setup in which the HMA-2 & 2A burner is used. A
typical setup should consist of a Flame Safety Control with appropriate air fl ow proving system and
a Modulating Gas Control System.

1. Verify the pressure across the burner. The pressure across the burner can be measured by

placing two static pressure probes, one downstream and one upstream of the profi le opening

and measure the differential pressure. The pressure should be within burner operating

specifi cations and within the expected calculated pressure. See Chart 2

2. With the burner off check the Flame Safety Air Proving System

a. Check the operation of the air proving system for low and high airfl ow setting. Refer to

the Specifi cations of the Flame Safety Control for setup instructions and air switch

operational characteristics.

Burner Setup

Flame Rod

Pilot

Spark Rod

Burner

Union

Modulating
Valve

Main Manual
Gas Valve

Combination Gas Valve
with Main & Pilot Regulator

Manual Firing
Valve

*

Manual
Pilot Valve

Pilot
Regulator

Pilot

Main Gas
Pressure
Tap

Burner

Pilot Tube

Union

Manual Firing
Valve

Modulating
Valve

Main
Manual Gas
Valve

Main
Regulator

Main
Operating
Valves

Safety Shut-off
Valve

Pilot Gas
Pressure Tap

Flame Rod

Spark Rod

* A manifold pressure tap
needs to be provided
at the burner to check
manifold pressure

*

Direct Spark Ignition
Typical
Gas Train Assembly

Direct Spark Ignition
Typical
Gas Train Assembly
400,000 BTU/Hr
and Under

Typical Gas Train Assembly

Continued

Figure 5b - Direct Spark Gas Train Assemblies

Advertising