Prepare for installation – LBL Lighting MO Surf Elec Xfmr 100w 277v/12v LED User Manual

Page 2

Advertising
background image

1A

2

CONDUIT

4.5” HOLE

FLEXIBLE
CONDUIT

Locate any electrical boxes and conduit already present in the

ceiling.

Cut a 4.5” diameter hole in the ceiling.Take care not to cut

into any existing electrical boxes or conduit.

Attach flexible conduit (not included) to an electrical box and

feed the conduit out of the hole.

If applicable: Screw the cover plate onto the open electrical

box.

Prepare for Installation

Remove the two #8-32 flat head screws from the power feed

port and pull off the canopy with coaxial cable.

SCREW

CANOPY

TRANSFORMER
COVER

PHILLIPS SCREW

Remove the four screws and take off transformer cover.

ELECTRICAL BOX

COVER PLATE

SCREW

1

2

3

4

1

2

3

4

5

5

5

1C

6

6

6

6

6

1B

Advertising