Reinstall the canopy – LBL Lighting MO Surf Elec Xfmr 100w 277v/12v LED User Manual

Page 4

Advertising
background image

4

Connect each of the power feed wires with a low-voltage

transformer wire with a wire nut.

CANOPY

Reinstall the Canopy

4A

1

1

6

1

Place the transformer wires and wire nut connections inside

the power feed port.

Mount the canopy to the power feed port with the two #8-32

flat head screws that were removed earlier.

SCREW

CANOPY

2

4B

6

2

6

3

3

3

Connecting the Center Power Feed
Connector to the MonoRail

5A

4

5

1

2

3

Connect the Monorail to the standoffs so that the Monorail is

secured in place. Refer to the instruction provided with the

standoff.

Make sure that the transformer power is off.

Place the power feed housing onto the Monorail.

Completely back out the screw on the power feed cap.

Screw the power feed cap completely to the power feed

housing. Make sure that the power feed cap is not cross
threaded.

Tighten the screw on the power feed cap for proper power

connection.

MONORAIL

POWER FEED
HOUSING

POWER
FEED CAP

SCREW

5B

6

3

5

4

6

7400 Linder Ave, Skokie, IL 60077

800.323.3226 - 847.626.6300

www.lbllighting.com

© 2013 LBL Lighting.All rights reserved.The "LBL Lighting" graphic is a
registered trademark of LBL Lighting. LBL Lighting reserves the right to
change specifications for product improvements without notification.

A Generation Brands Company

Advertising