Voltage confirmation – American Power Conversion XR User Manual

Page 32

Advertising
background image

Operation – Restart Procedure

24

Smart-UPS® VT 10-30 kVA, 208/220 V and XR Battery Enclosure Operation Manual 990-1599B

After system boot-up, the display will automatically prompt you on how to confirm/select voltage
and frequency as shown in the following.

Voltage confirmation

At the restart, the display will prompt you through the following screens:

• When the Confirm Voltage prompt appears on the screen, select desired voltage and press

ENTER.

• When the prompt Apply load appears, select Yes if you want the UPS to provide a load output

now. (If you do not want a UPS load output at this point, select No).

LOAD ON LED is now lit, and the display will show the Confirm Menu Screen.

Note

Wait approximately 30 seconds for the system to boot up and carry out self test.

See display introduction under The Display.

Note

The UPS is now ready to support the load.

Note

Auto-detection on frequency – if problem occurs call APC Customer Support.

Confirm Voltage
Use 208V
Yes, use 208V
No, select another

Apply load?
Yes
No

Chrg xxx% ||||||||||
Load xxx% ||||||||||
xxx Vin xxxVout xxHz
Runtime: xxhr xxmin

Status screen

Advertising
This manual is related to the following products: