Allied Telesis x510 Series User Manual

Page 106

Advertising
background image

Chapter 8: Cabling the Networking Ports

106

Figure 52. Installing an SFP Transceiver

Note

If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 to 4 to install
the remaining SFP transceivers in the switch.

5. Remove the dust cover from the transceiver, as shown in Figure 53.

Figure 53. Removing the Dust Cover from an SFP Transceiver

6. Verify the position of the handle on the SFP transceiver. If the

transceiver is in a top slot, the handle should be in the upright position,
as shown in Figure 54 on page 107. If the transceiver is in a bottom
slot, the handle should be in the down position.

Advertising