Unpacking a switch – Allied Telesis AT-GS950/8POE User Manual
Page 37

AT-GS950/8POE Gigabit Ethernet WebSmart Switch Installation Guide
37
Unpacking a Switch
To unpack a switch, perform the following procedure:
1. Remove all components from the shipping packages.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Make sure the following components are included in your switch
package. If any item is missing or damaged, contact your Allied Telesis
sales representative for assistance.
One AT-GS950/8POE Gigabit Ethernet WebSmart Switch
Two rack-mount brackets
Eight flathead Phillips rack-mount bracket screws
Four #10-32 Phillips screws with nylon washers
AC power cord (Americas, Australia, EU, Japan, and UK only)
Four self-adhesive rubber feet
Documentation CD