Sfp handle – Allied Telesis AT-GS950/8POE User Manual
Page 51
Advertising

AT-GS950/8POE Gigabit Ethernet WebSmart Switch Installation Guide
51
2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. Position the transceiver with the label facing up.
4. Slide the transceiver into the slot until it clicks into place. See
Figure 15. Installing an SFP Transceiver
5. Verify that the handle on the SFP transceiver is in the upright position,
as shown in Figure 16, to prevent inadvertently removing the
transceiver.
6. Remove the SFP cover as shown in Figure 16.
Figure 16. Removing the SFP Cover
1344
SFP
SFP
CLASS
1
LASER
PRODUCT
8R
7
8
100/1000B
ase-X
SFP Handle
1345
SFP
SFP
CLASS
1
LASER
PRODUCT
8R
7
8
100/1000B
ase-X
SFP Handle
Advertising