Chapter 2: installing the hardware 40, Class 1 laser p roduct – Allied Telesis AT-GS950/8POE User Manual
Page 40
Advertising

Chapter 2: Installing the Hardware
40
Figure 8. Attaching Rack-Mount Brackets
5. Install the second rack-mount bracket on the other side of the switch
with the four remaining screws.
6. Mount the switch in a 19-inch rack using standard screws (not
provided), as shown in Figure 9.
Figure 9. Mounting the Switch in a Rack
Note
For cabling information, see Chapter 3, “Cabling the Network Ports”
on page 45.
1348
AT-GS950/
8POE
8 Port 10/100/
1000Mbps
+ 2 SFP Comb
o WebSma
rt Switch
SFP
SFP
CLASS 1
LASER P
RODUCT
1
2
3
4
5
6
7R
7
8
8R
POWER
RESET
1
2
3
4
5
6
7R
8R
7
8
POE
100/1000Base-X
PORT
ACTIVIT
Y
ACT
1000 LIN
K
100 LIN
K
ACT
ACT
SFP
1349
SFP
SFP
CLASS 1
LASER PR
ODUCT
5
6
7R
8R
7
8
100/1000B
ase-X
Advertising