Allied Telesis ALLIEDVIEW-UM 1.6 User Manual
Page 121

Allied Telesis
AlliedView-UM
1.6
User's Guide
PN 613-000381 Rev B
Page 121 of 129
18.2 SPECIAL
RULES
ON
ROLLBACKS
If the last entry in the Audit Trail is a Reboot Device operation or an Execute Script File operation, then
AlliedView-UM will locate the most recent non-Reboot Device operation entry in the Audit Trail. That
entry will be the one to be rolled back.
#
AUDIT
1
Release Upgrade 1
2
Patch Upgrade 1
3
Configuration File Update 1
4
Patch Upgrade 2
5
Release Upgrade 2
6
Release Upgrade 3
7 Reboot
Device
In the example above, the most recent non-Reboot entry in the Audit Trail is “Release Upgrade 3”.
“Release Upgrade 3” will be the operation to be rolled back. If the last entry on the Audit Trail is a
Rollback operation, then a Rollback cannot be performed.