Vertical contact toaster, Maintenance (continued), A.j. antunes & co – A.J. Antunes & Co VCT-1000 9210717 User Manual
Page 10: Replacing the belt wraps (every 3–6 months)
Vertical contact toaster
10
P/N 1010884 Rev. D 04/12
A.J. Antunes & Co.
maintenance (continued)
replacing the belt wraps
(every 3–6 months)
nOte: Depending on toaster usage and how well
they are cleaned daily, the belt wraps should
last between 3–6 months. additional belt wraps
may be purchased from your authorized service
agency.
1. turn the power off, unplug the power cord, and
allow the unit to cool before proceeding.
2. Remove the bun feeder, butter Wheel, Pan, and
Heat shield (figure 1) and set the bun thickness
compression Knobs to 6 & 6.
3. Open both conveyor covers and pull the belt
Wrap Pin out of the zipper (figure 6).
4. Remove and discard the old belt Wrap(s).
5. clean both conveyor belt chains just as
you would clean the belt Wraps during Daily
cleaning.
6. install the new belt Wraps around the conveyor
belt chains inside the yellow rods with the zipper
flap exposed and hanging down (figures 6 & 7).
7. close the conveyor cover(s), set the bun
Thickness compression Knobs back to their
normal settings and reinstall the Heat shield and
bun feeder.
CA
UT
ION
INCORRECT
CORRECT
figure 6. installing Optional belt wrap
figure 7. aligning belt teeth
belt Wrap
Pin
belt Rotation
upper
support
Rod
Lower
support Rod
cautiOn
Position the belt Wrap inside the upper and Lower
support Rods or damage to the unit may occur.
cautiOn
align the ends of the belt Wrap properly (figure 7) or
the belt Wrap may be damaged.
figure 5. removing Optional belt wrap
1
2
4
5 1 = 1/2"(12.7mm)
2 = 5/8"(15.9mm)
3 = 11/16"(17.5mm)
6 = 7/8"(22.2mm)
THICKNESS
THICKNESS
1
2
3
4
6
6
5
4 = 3/4"(19.1mm)
5 = 13/16"(20.6mm)
3
conveyor
interlock
switch
conveyor
cover assy.
belt Wrap
Pin
replacing the black and silver release
sheet (every 4–6 weeks)
nOte: Depending on toaster usage and on how
well it is cleaned daily, the black and silver release
sheet should last between 30–45 days.
1. Remove and discard the Release sheet.
2. Lay a new Release sheet on a clean, dry surface
and fold it in half lengthwise and gently crease it
at the fold using only your fingers (figure 4).
3. install the Release sheet just as you would after
Daily cleaning.
conveyor belt
chains
fold over so
ends meet.
Press lightly with
finger to form crease.
figure 4. folding the release sheet