Vertical contact toaster, Maintenance (continued), A.j. antunes & co – A.J. Antunes & Co VCT-1000 9210717 User Manual

Page 12

Advertising
background image

Vertical contact toaster

12

P/N 1010884 Rev. D 04/12

A.J. Antunes & Co.

maintenance (continued)

checking the Optional roller tensioners

(every 3–6 months)

measurinG tHe rOller tensiOners

1. Measure the Roller tensioner on both inner

conveyor covers (figure 10) using a u.s. Nickel.

2. the space between the inner conveyor cover

and bottom of the tensioner wheel should be

13/16” (2.1 cm) or the height of a u.s. Nickel.

3. adjust or replace any damaged ones as

recommended.

replacinG tHe rOller tensiOners

1. Remove the acorn Nuts and old Roller tensioner

assembly (figure 11).

2. Replace tensioner assembly, and reassemble.

3. Make sure the spacers are placed inside the

tensioner arm. the spacers are smaller than the

holes to allow the tensioner to pivot freely.

replacinG tHe sprinG tensiOner

1. Remove the acorn Nuts (figure 12).

2. Remove the old spring tensioner assembly

(figure 12).

3. Replace tensioner assembly and reassemble

unit.

Weld

screws

acorn Nuts

spacers

tensioner

assy.

tape

figure 11. replacing the roller tensioner

figure 10. measuring roller tensioner

figure 12. replacing spring tensioner

Weld

screws

acorn Nuts

spring

tensioner

assy.

tape

Advertising
This manual is related to the following products: