Vertical contact toaster, Maintenance (continued) – A.J. Antunes & Co VCT-1000 9210719 User Manual

Page 10

Advertising
background image

VERTICAL CONTACT TOASTER

10

P/N 1010930 Rev. C 09/13

Figure 6. Conveyor Belt Links

Rotation

Upper Support Rod

Large Link

P/N 0800121

Small Link

P/N 0800204

MAINTENANCE (continued)

Figure 5. Measuring the Conveyor Belt Links

Checking the Conveyor Belt Chains

(Every 3–6 Months)

NOTE: The Bun Thickness Compression Knobs

(Figure 3) must be set to “6 & 6” prior to measur-

ing or removing or reinstalling the Conveyor Belt

Chains.

MEASURING CONVEYOR BELT CHAINS

1. Turn the unit off, unplug the power cord, and

allow the unit to cool.

2. Remove the Butter Wheel, Pan, and Heat

Shield (Figure 1) and set the Bun Thickness

Compression Knobs to 6 & 6.

3. Open both Conveyor Covers.
4. Facing the toaster, locate the approximate center-

point of the Conveyor Chain.

5. Pull the Conveyor Chain away from the edge of

the toaster (Figure 5).

6. Stand a U.S. Dime on end between the frame

and the chain (Figure 5).

7. If the gap is significantly wider than the coin,

REMOVE links as described below.

8. Disconnect the Conveyor Belt Chain by squeez-

ing any two links together and unhooking both

ends one link (Figure 6). Needle-nose pliers may

be used.

NOTE: There are two small 1/2” links on each side

of the Conveyor Belt Chain. The rest are large 3/4”

links.
9. Remove one 1/2” link from the belt.
10. Reassemble the Conveyor Belt Chain onto the

sprockets as described in Replacing Conveyor

Belt Chains.

11. Measure the gap again to ensure it is not too

tight.

12. Check the opposite side of the toaster using the

same steps.

NOTE: If the Conveyor Belt Chain is too tight to be

reassembled, remove an additional small 1/2” link

and install a large 3/4” link in its place. This will

shorten the Conveyor Belt Chain by 1/4” overall.

Advertising