Vertical contact toaster, Maintenance (continued) – A.J. Antunes & Co VCT-1000 9210719 User Manual

Page 11

Advertising
background image

11

P/N 1010930 Rev. C 09/13

VERTICAL CONTACT TOASTER

MAINTENANCE (continued)

Figure 7. Replacing Spring Tensioner Assy.

Weld

Screws

Acorn Nuts

Spring

Tensioner

Assy.

Replacing the Spring Tensioners

1. Remove the Acorn Nuts (Figure 7).

2. Remove the old Spring Tensioner Assembly.

3. Replace Tensioner Assembly and reassemble

unit.

Tape

REPLACING CONVEYOR BELT CHAINS

1. Turn the power off, unplug the power cord, and

allow the unit to cool before proceeding.

2. Remove the Butter Wheel, Pan, and Heat Shield

and set the Compression Control Knobs to 6 & 6.

3. Open both Conveyor Covers.
4. Disconnect the Conveyor Belt Chain by squeezing

any two links together and unhooking both ends

of one link (Figure 6).

5. Place the replacement Conveyor Belt Chain on

the top sprockets with hook ends down.

NOTE: The ends of the hooks must point down

(Figure 6).
6. Wrap the Conveyor Belt Chain around the top

and lower sprockets and connect by hooking both

ends together.

NOTE: Make sure the Conveyor Belt Chain is

installed under the Upper Support Rod and over the

Lower Support Rod.

Advertising