Installation, Connectionless models, Water line connection - connected models – AccuTemp EVOLUTION ELECTRIC STEAMER User Manual

Page 7: Connected models

Advertising
background image

MP4008-0910

EVOLUTION STEAMER OWNERS MANUAL

Page 5

INSTALLATION

CONNECTIONLESS MODELS

This model must be manually filled. A full-size steam table pan or a 1/1 gastronome pan with

a minimum depth of 4” must be installed in the rails underneath the steamer (See Fig. 2)

Failure to install this pan during normal operation can cause damage. It is essential when

draining not to spill or open the drain without this installed. Warranty doesn’t cover any failure

due to this pan not being installed. This pan is not supplied with the steamer and is the

owners responsibility.

WATER LINE CONNECTION - CONNECTED MODELS

The Installer/Owner is responsible for the water connection of this appliance. This appliance is

to be installed to comply with all applicable federal, state, or local plumbing codes. The

National Sanitation Foundation (NSF) requires installation of a check-valve (or other approved

anti-backflow / anti-siphon device) (not provided) in all supply lines in accordance with and as

required by local, state, and national health, sanitation, and plumbing codes.

Fig. 2

CONNECTED MODELS

This model requires a water line connection and a drain connection. These parts are not

supplied with the steamer and are the owners responsibility.

Water Line Connection
Connected Models Only

Fig. 3

Full Size Steam Table Pan

4” Deep

This pan is an optional accessory and must

be supplied by the customer

Advertising