b. InsTallaTIon

b.1 Pre-Installation

Uncrate the broiler and inspect for shipping damage. Remove the tape securing the machine parts, and

install the parts in their proper location. If there are obvious or concealed damages to any part of the

broiler, please contact your freight carrier. The factory warranty does not cover freight damage.

b.2 Mounting

Follow the mounting instructions if this function is not performed by the installer.

b.3 leveling

The grease drain system is based on a gravity-flow design. Therefore, it is extremely important that the

broiler be placed on a level surface.

b.4 Hood Requirements

This appliance must be installed under a ventilation hood of adequate size. Do not obstruct the flow of

combustion and ventilation air. An adequate air supply must be available for safe and proper operation.

For installations in the Commonwealth of Massachusetts the following shall apply: Venting shall be in

compliance with NFPA Section 10.3.5.2 for the Model JF63.

b.5 Clearance

Keep appliance area free from combustibles.
To facilitate disassembly and service of the unit a minimum of 24” (610 mm) should be allowed on the

control panel (feed end) of the broiler.

ReQUIReD for

installation near

combustible walls

and construction

ReQUIReD for installa-

tion near non-com-

bustible walls and

construction

ReCoMMenDeD by

Nieco for proper disas-

sembly and service

Back of broiler

Sides of broiler

Front of broiler

(Feed end)

ReQUIReD anD ReCoMMenDeD CleaRanCes

12” (305 mm)

0” (0 mm)

0” (0 mm)

24” (610 mm)

0” (0 mm)

0” (0 mm)

0” (0 mm)

12” (305 mm)