American Dryer Corp. AD-60 User Manual

Page 34

Advertising
background image

30

a. The pressure of the condensate in the steam supply will cause water hammer and subsequent heat

exchanger (steam coil) failure. The steam supply connection into the main supply line must be made
with a minimum 10-inch (25.4 cm) riser. This will prevent any condensate from draining towards the
dryer.

b. The steam supply piping to the dryer must include a 12-inch (30.48 cm) rise along with a drip trap and

check valve. This will prevent any condensate from entering the steam coil.

c. Flexible hoses or couplings must be used. The dryer vibrates slightly when it runs and this will cause

the steam coil connections to crack if they are hard piped to the supply and return mains.

d. Shutoff valves for each dryer should be installed in the supply line, return line, and drip trap return line.

This will allow the dryer to be isolated from the supply main and the return main if the dryer needs
maintenance work.

e. Install an inverted bucket steam trap and check valve at least 12-inches (30.48 cm) below the steam

coil as close to the coil as possible.

1) A trap with a capacity of 430 lbs (195.04 kg) of condensate per hour at 125 PSI (8.62 bars) is

needed for each unit.

f. The supply line and the return line should be insulated. This will save energy and provide for the safety

of the operator and maintenance personnel.

g. Water pockets in the supply line, caused by low points, will provide wet steam to the coil possibly

causing steam coil damage. ALL horizontal runs of steam supply piping should be pitched 1/4-inch
(6.35 mm) for every 1 foot (0.30 meters) back towards the steam supply header causing the condensate
in the line to drain to the header. Install a bypass trap in any low point to eliminate wet steam.

IMPORTANT: Flexible hose/coupling must be used. Coil failure due to hard plumbing connections

will VOID THE WARRANTY.

Advertising