Day bed conversion required hardware – Westwood Design Monterey Convertible Crib User Manual

Page 13

Advertising
background image

Day Bed Conversion

Required Hardware

6 x Allen Bolt, 1-1/8” Long (P)

Allen Wrench (R)

6 x Cap Nut (Q)

Allen Bolt (P)

Cap Nut (Q)

A. If the guard rail was installed, remove the 4 bolts attaching the guard rail to
the crib, and remove the guard rail. Save all hardware for future reassembly of
your crib.
B. Insert the allen bolt (P) through the hole in the corner post, and thread it into
the cap nut as shown. Tighten securely using the allen wrench.
C. Repeat with the other 5 holes.

Advertising