Ip20 easy start-up guide – Beijer Electronics Industrial Inverter E2 User Manual

Page 2

Advertising
background image

2






























































AC Supply Voltage

(50 / 60Hz)


L1 L2 L3
Earth L N

Fuses or MCB

Supply Voltage :

-

110-115, 200-240, 400-480 +/- 10%

-

1 or 3 Phase

-

Check the drive rating information on page 28

Fuses or MCB, Cable Sizes :

-

Check the drive rating information on page 28

-

Recommended cable sizes shown on page 28

-

Keypad operation can be found on page 17

Control Terminals :
Based on the default, out of box settings –

-

Connect a Start / Stop switch between terminals 1 & 2

-

Close the switch to start

-

Open the switch to stop

-

Connect a potentiometer (5kΩ minimum) terminals 5, 6 &
7 to vary the speed from minimum (0Hz) to maximum (50
/ 60Hz)

-

Motor Cable Sizes

-

Check the rating information on page 28

-

For EMC compliance, use a shielded type cable

Motor Connections

-

Check for Star or Delta connection according to the motor
voltage rating (See page 13)

Motor Nameplate Details

-

Enter the motor rated voltage in P-07

-

Enter the motor rated current in P-08

-

Enter the motor rated frequency in P-09

IP20 Easy Start-Up Guide

RJ45

Connector

Mechanical Mounting

-

Information can be found on page 10

Advertising