Machine preparation – NaceCare Solutions ST50BT User Manual

Page 6

Advertising
background image

6

MACHINE PREPARATION

UNPACKING THE MACHINE

Figure 2

The machine is delivered packed on pallet. To move it use a fork truck or a pulley block
with sling (see Figure 3).
To remove the package proceed as follows:
• Remove the fixing tapes.
• Remove the metal staples at package base.

• Take the cardboard box off.
Package size: cm 153x76x119
Weight of packed machine s50B :

P = 95 Kg

Weight of packed machine s50S :

P = 103.5 Kg

Figure 3

SLIDING THE MAHCINE DOWN THE PALLET

Figure 4

• Place a sliding board near the pallet.
• Pull the machine backwards and make it pass over the blocking ledges.
• Slide the machine down along the board.

REFUELLIING (GAS ENGINE MACHINE ONLY)

WARNING

Before refuelling you should carefully read the information contained in the engine’s
specific OPERATING AND MAINTENANCE INSTRUCTIONS, delivered together with the

machine.

Advertising