II. INSTALLATION

A.

GENERAL

This section provides the recommended procedures for properly

installing the 720 Series II pH/ORP Monitor/controller, and

sensors. For OEM models see section II.C.

WARNING: THE MYRON L COMPANY RECOMMENDS

THAT

ALL

MOUNTING

AND

ELECTRICAL

INSTALLATIONS BE PERFORMED BY QUALIFIED

PERSONNEL ONLY. FAILURE TO DO SO COULD

CAUSE DAMAGE TO INSTRUMENT, AND COULD BE

HARMFUL OR FATAL TO PERSONNEL.

B.

MECHANICAL INSTALLATION

All Monitor electronics are packaged inside drip/weather-proof

housings. The physical dimensions of the housing is suitable for

panel, bench or surface mounting.

There are three basic guidelines to consider when selecting a

Monitor’s mounting location:

1. Select a site that limits the Monitor/controller’s exposure

to excessive moisture and corrosive fumes.

2. If at all possible, mount the Monitor/controller at eye

level for viewing convenience.

3. If needed, the enclosure may be rotated or mounted

upside down so that the cutouts are on the opposite

side.

1. SURFACE MOUNTING WITH SMP

NOTE: A Surface Mounting Plate (SMP50) may be required when

access to the back side of the mounting site is impractical or if

the Monitor/controller must be mounted on a solid wall. The

SMP50 comes with the proper hardware to mount the

Monitor/controller to the SMP, however, the installer must provide

the four (4) additional screws/bolts to mount the SMP to the wall or

fixture. Their size is to be determined by the user.

1. Select your mounting location. Mark four (4) required

mounting holes. For hole locations, use the SMP as a

template.

2. Drill the corner holes in the SMP according to the size of

the screws or bolts selected.

3. Attach and securely fasten the SMP to the Monitor using

the 1/4” - 20 X 3/8” screws provided.

4. Mount the SMP to the prepared site using the selected

screws or bolts.

2. SURFACE MOUNTING WITHOUT SMP

NOTE: Surface mounting will require two (2) 1/4” - 20 screws of a

length equal to the thickness of the mounting site plus 3/8”.

1. Select mounting site location. Mark and drill the required

mounting holes. For hole drilling locations, see figure

II.B.1.

2. Insert the 1/4” - 20 screws into the holes from the side

opposite the mounting site.

3. Hold the Monitor/controller in place while starting and

tightening the mounting screws.

3. PANEL MOUNTING

A panel mounting fastening kit is provided with all

Monitor/controllers. Panel mounting will require the use of the

fastening kit’s two (2) 4-40 mounting screws/nuts or two (2) #4 -

1/2” sheet metal screws. See figure II.B.1 for panel cutout

dimensions.

1. Select your mounting location. Mark the appropriate

panel cutout and complete the necessary panel cut.

2. Carefully unfasten and separate the Monitor/controller’s

front panel from its enclosure.

3. Disconnect all panel cable(s)/wires from the

Monitor/controller’s main circuit board.

9

!

CAUTION - READ FOLLOWING CAREFULLY

DOUBLE INSULATED

SURFACE AND PANEL MOUNTING DIAGRAMS

NOT TO SCALE

DIMENSIONS IN INCHES

(MILLIMETERS)

HIGH

LOW

SET POINT

4.80

(122)

3.89

(99)

0.63 THK

(16)

3.10

(79)

0.40

(10)

SURFACE

MOUNT

1.05

(27)

2.84

(72)

0.31 DIA, X2

(8)

5.00

(127)

3.96

(101)

0.13 RAD MAX, X4

(3)

0.113

(3)

2.54

(64)

4.17

(106)

0.11

(3)

PANEL

CUTOUT

6.00

(152)

0.5

(13)

0.88 DIA

(22)

1.13 DIA

(29)

0.53

(14)

4.94

(126)

0.60 DIA

(15)

3.78

(96)

0.50 DIA

(13)

Figure II.B.1.

MYRON L
COMPANY

Face Plate Gasket Panel Gasket

Face Plate Gasket

Panel Gasket

pH

6-32x3/8 ”x4

Advertising
This manual is related to the following products: