Goulds Pumps 3620 - IOM User Manual

Page 28

Advertising
background image

Installation

• Puddle with a vibrator.

• Pump the grout into place.

5. Allow the grout to set.

1. Baseplate
2. Shims or wedges
3. Grout
4. Foundation
5. Sleeve
6. Dam
7. Bolt

6. Fill the remainder of the baseplate with grout, and allow the grout to set for at least 48

hours.

1. Baseplate
2. Grout
3. Foundation
4. Dam
5. Bolt

7. Remove the leveling jackscrews after the grout hardens in order to remove any stress

points.

8. Tighten the foundation bolts.
9. Recheck the alignment.

26

Model 3620, API Type BB2 Single Stage / ISO 13709 1st/2nd Ed. / API 610 8th-11th Ed. Installation, Operation, and

Maintenance Manual

Advertising