Caution – Bloomfield 8572 User Manual

Page 10

Advertising
background image

BREWING COFFEE

CAUTION:

BURN HAZARD

Exposed surfaces of the
brewer, brew chamber and
decanter may be HOT to
the touch, and can cause
serious burns.

CAUTION:

BURN HAZARD

To avoid splashing or over-
flowing hot liquids,
ALWAYS place an empty
decanter under the brew
chamber before starting
the brew cycle. Failure to
comply can cause serious
burns.

CAUTION:

BURN HAZARD

After a brew cycle, brew
chamber contents are
HOT. Remove the brew
chamber and dispose of
used grounds with care.
Failure to comply can
cause serious burns.


NOTE:

Water for the hot

water faucet is heated in a
coil inside of the water
tank. Use of the faucet will
not affect the volume of
water delivered for a brew.
However, overuse of the
faucet during a brew may
lower the temperature of
the brew water.

B. PREPARATION

Place one (1) genuine Bloomfield

paper filter in the brew chamber.

Add a pre-measured amount of

fresh

coffee

grounds.

Gently shake the brew chamber to

level the bed of grounds. Slide the

brew chamber into place under the

brew

head.


C. POUR-OVER

OPERATION

NOTE:

Any Integrity™ brewer can be used in the pour-over mode.

BE sure “READY TO BREW” light is lit.

Place the appropriate EMPTY decanter in place under the brew

chamber.

Fill a decanter with tap water. Lift the pour-over cover and pour the

entire contents of the decanter into the pour-over opening, which

will fill the basin.

Water from the basin will displace a like amount of heated water

from the tank. The hot water will be forced into the brew head

where it will spray over the bed of grounds. Freshly brewed coffee

will begin to fill the container under the brew chamber. When the

flow and all dripping stops, the coffee is ready to serve.

Discard the contents of the brew chamber. Rinse the brew

chamber in a sink. When the ”READY TO BREW” light glows, the

brewer is ready for another brew cycle.


C. AUTOMATIC

OPERATION

BE sure “READY TO BREW” light is lit.

Place

an

EMPTY

decanter in place under the brew chamber.

Press the “BREW” switch. The solenoid will open for an amount of

time determined by the timer setting, admitting a measured quantity

of water into the basin.

Water from the basin will displace a like amount of heated water

from the tank. The hot water will be forced into the brew head

where it will spray over the bed of grounds. Freshly brewed coffee

will begin to fill the decanter under the brew chamber. When the

coffee flow and all dripping stops, the coffee is ready to serve.

Discard the contents of the brew chamber and rinse it in a sink.

When the ”READY TO BREW” light glows, the brewer is ready

for another brew cycle.

PAPER
FILTER

BREW
CHAMBER

Fig. 7 Brew Chamber

8

M

611 75804

Owne

rs M

anual

Koffee-K

ing™ B

rewers

Advertising
This manual is related to the following products: