Installation – InnoMax Scape Adjustable Power Base User Manual

Page 8

Advertising
background image

PowerBASE Owners Manual

INSTALLATION

6. Remove the plastic packaging from the

bed base frame. Carefully rotate the base
frame over to position the bed top-side-up.

7. Plug power cord into a working, grounded

electrical outlet.

Note: an electrical surge

protection device is recommended (not

included).

8. If hand control is non-wired type, Install

batteries in hand control (wired hand
controls do not require batteries). Briefly
activate all functions of the bed with the
hand control to verify all features are in
working order. If bed does not operate,
refer to the Troubleshooting section of this
manual.

9. Return bed to the level position.

2. Carefully Lift the bed base frame from the

shipping carton, keeping the unit top-side-
down.

3. Install (4) legs into the base frame. Simply

screw each leg into a tapped hole at each
corner of the base frame (FIGURE 1). Insert
casters into the bottom of each bed leg (if
applicable).

4. Remove and extend out power cord from

the protective packaging.

5. For beds equipped with power down box,

install (2) 9 volt batteries into the power
down box (FIGURES 2 and 3).

Note: beds

not equipped with power down box do

not require batteries.

FIGURE 1: PowerBASE™ leg installation. Caster installation (if

applicable).

LEGS – SCREW INTO

TAPPED HOLE AT

EACH CORNER

CASTERS – PRESS-FIT

INTO BOTTOM OF

LEGS (IF APPLICABLE)

POWER CORDS MUST NOT INTERFERE

WITH ANY ADJUSTABLE BED

MECHANISMS.

FIGURE 2: Power down box battery compartment door

removal.

PRESS IN (SLIGHTLY) AND

PUSH DOWN TO REMOVE

BATTERY COMPARTMENT

DOOR

POWER DOWN BOX

BATTERY COMPARTMENT DOOR

BATTERY ORIENTATION IS

INDICATED INSIDE BATTERY

COMPARTMENT

DOOR REINSTALLATION:

PRESS COMPARTMENT DOOR

AGAINST THE BATTERY ENDS,

SLIDE DOOR UP AND IN

TO ENGAGE THE DOOR TABS

TABS

FIGURE 3: Power down box battery installation and battery

compartment door reinstallation.

6

Advertising