ARB RD93 User Manual

Page 3

Advertising
background image

Table of Contents:

1

1 Introduction

3

1.1 Pre-Installation Preparation

3

1.2 Tool-Kit Recommendations

4

2 Removing the Existing Differential

5

2.1 Vehicle Support

5

2.2 Differential Fluid Drain

5

2.3 Removing the Axles

5

2.4 Marking the Bearing Caps

6

2.5 Checking the Current Backlash Amount

7

2.6 Removing the Differential Carrier

8

3 Installing the Air Locker

10

3.1 Mounting the Ring Gear

10

3.2 Installing the Carrier Bearings

11

3.3 Drilling and Tapping the Bulkhead Port

12

3.4 Setting the Backlash

13

3.5 Profiling the Seal Housing Tube

14

3.6 Setting up the Bulkhead Fitting

16

3.7 Re-Installing the Axles

18

4 Installing the Air System

19

4.1 Mounting the Solenoid

19

4.2 Running & Securing the Air Line

21

4.3 Connection to the Bulkhead Fitting

22

5 Mounting & Connecting the Electrical System

23

5.1 Mounting the Actuator Switch(es)

23

5.2 Wiring the Actuator System

24

6 Testing & Final Assembly

27

6.1 Leak Testing

27

6.2 Testing the Air Locker Actuation

27

6.3 Re-Sealing & Filling the Differential

28

6.4 Post-Installation Check List

29

7 Parts List

31

7.1 Exploded Assembly Diagram

31

7.2 Itemized Parts List

32

Advertising