ARB RD103 User Manual

Page 3

Advertising
background image

Table of Contents:

1

1 Introduction

3

1.1 Pre-Installation Preparation

3

1.2 Tool-Kit Recommendations

4

1.3 Assembly Type Identification

5

2 Removing the Existing Differential

6

2.1 Vehicle Support

6

2.2 Differential Fluid Drain

6

2.3 Removing the Axles

7

2.4 Marking the Bearing Caps

8

2.5 Checking the Current Backlash Amount

9

2.6 Removing the Differential Center

10

3 Installing the Air Locker

12

3.1 Insuring Adequate Oil Drainage

12

3.2

Installing the Carrier Bearings

14

3.3

Approximate Backlash Shimming

15

3.4

Mounting the Ring Gear

17

3.5

Drilling and Tapping the Bulkhead Port

18

3.6

Assembling the Seal Housing

19

3.7

Pre-Load Shimming

20

3.8

Reinstalling the Bearing Caps

23

3.9

Checking the Backlash

24

3.10

Setting Up the Bulkhead Fitting

25

3.11

Profiling the Seal Housing Tube

27

4 Installing the Air System

28

4.1 Mounting the Solenoid

28

4.2 Running & Securing the Air Line

30

4.3 Connection to the Bulkhead Fitting

31

5 Mounting & Connecting the Electrical System

33

5.1 Mounting the Actuator Switch(es)

33

5.2 Wiring the Actuator System

34

6 Testing & Final Assembly

38

6.1 Leak Testing

38

6.2 Reinstalling the Axles

38

6.3 Testing the Air Locker Actuation

41

6.4 Re-Sealing & Filling the Differential

41

6.5 Post-Installation Check List

42

7 Parts List

43

7.1 Exploded Assembly Diagram

43

7.2 Itemized Parts List

44

Advertising