ARB RD99 User Manual

Page 3

Advertising
background image

Table of Contents:

1

1 Introduction

3

1.1 Pre-Installation Preparation

3

1.2 Tool-Kit Recommendations

4

1.3 Assembly Type Identification

5

2 Removing the Existing Differential

6

2.1 Vehicle Support

6

2.2 Differential Fluid Drain

6

2.3 Removing the Axles

7

2.4 Marking the Bearing Caps

7

2.5 Checking the Current Backlash Amount

8

2.6 Removing the Differential Carrier

9

3 Installing the Air Locker

10

3.1

Installing the Carrier Bearings

10

3.2

Re-Mounting the Ring Gear

11

3.3

Drilling and Tapping the Bulkhead Port

12

3.4

Checking for Assembly Clearance

13

3.5

Checking the Backlash

15

3.6

Assembling the Seal Housing

16

3.7

Profiling the Seal Housing Tube

18

3.8

Setting Up the Bulkhead Fitting

19

3.9

Bench Testing the Air Locker

21

3.10

Reinstalling the Differential and Axles

22

4 Installing the Air System

23

4.1 Mounting the Solenoid

23

4.2 Running & Securing the Air Line

25

4.3 Connection to the Bulkhead Fitting

26

5 Mounting & Connecting the Electrical System

28

5.1 Mounting the Actuator Switch(es)

28

5.2 Wiring the Actuator System

29

6 Testing & Final Assembly

33

6.1 Leak Testing

33

6.2 Testing the Air Locker Actuation

34

6.3 Re-Sealing & Filling the Differential

34

6.4 Post-Installation Check List

35

7 Parts List

37

7.1 Exploded Assembly Diagram

37

7.2 Itemized Parts List

38

Advertising