ARB RD40 User Manual

Page 3

Advertising
background image

Table of Contents:

1

1 Introduction

3

1.1 Pre-Installation Preparation

1.2

1.3 Tool-Kit Recommendations

1.4

2 Removing the Existing Differential

5

2.1

Vehicle Support

5

2.2

Differential Fluid Drain

5

2.3

Removing the Axles

5

2.4

Marking the Bearing Caps

6

2.5

Checking the Current Backlash Amount

7

2.6

Removing the Differential Carrier

8

3

Installing the Air Locker

9

3.1

Installing the Carrier Bearings

9

3.2

Mounting the Ring Gear

10

3.3

Drilling & Tapping the Bulkhead Port

11

3.4

Assembling the Differential Carrier

12

3.5

Approximating the Backlash for Tube Position

12

3.6

Marking the Bearing Cap for Tube Clearance

13

3.7

Modifying the Bearing Cap

15

3.8

Final Air Locker Assembly

17

3.9

Checking the Backlash

17

3.10

Profiling the Seal Housing Tube

19

3.11

Setting up the Bulkhead Fitting

19

3.12

Reinstalling the Axles

21

4

Installing the Air System

22

4.1

Mounting the Solenoid

22

4.2

Running & Securing the Air Line

24

4.3

Connection to the Bulkhead Fitting

25

5

Mounting & Connecting the Electrical System

27

5.1

Mounting the Actuator Switch(es)

27

5.2

Wiring the Actuator System

28

6

Testing & Final Assembly

32

6.1

Leak Testing

32

6.2

Testing the Air Locker Actuation

32

6.3

Re-Sealing & Filling the Differential

33

6.4

Post-Installation Check List

34

7

Parts List

35

7.1

Exploded Assembly Diagram

35

7.2

Itemized Parts List

36

Advertising