ARB RD197 User Manual

Page 3

Advertising
background image

Table of Contents:

1

1 Introduction

3

1.1 Pre-Installation Preparation

3

1.2 Tool-Kit Recommendations

4

1.3 Assembly Type Identification

5

2 Removing the Existing Differential

6

2.1 Vehicle Support

6

2.2 Differential Fluid Drain

6

2.3 Disconnecting the Axles

7

2.4 Marking the Bearing Caps

8

2.5 Checking the Current Backlash Amount

8

2.6 Removing the Differential Center

11

3 Installing the Air Locker

12

3.1 Re-Mounting the Ring Gear

12

3.2

Drilling and Tapping the Bulkhead Port

13

3.3

Profiling the Seal Housing Tube (A)

15

3.4

Assembling the Seal Housing

17

3.5

Installing the Carrier Bearings

19

3.6

Final Air Locker Assembly

20

3.7

Profiling the Seal Housing Tube (B)

22

3.8

Checking the Backlash

23

3.9

Setting Up the Bulkhead Fitting

23

3.10

Reinstalling Differential and Axles

25

4 Installing the Air System

26

4.1 Mounting the Solenoid

26

4.2 Running & Securing the Air Line

28

4.3 Connection to the Bulkhead Fitting

29

5 Mounting & Connecting the Electrical System

31

5.1 Mounting the Actuator Switch(es)

31

5.2 Wiring the Actuator System

32

6 Testing & Final Assembly

36

6.1 Leak Testing

36

6.2 Testing the Air Locker Actuation

37

6.3 Re-Sealing & Filling the Differential

37

6.4 Post-Installation Check List

38

7 Parts List

39

7.1 Exploded Assembly Diagram

39

7.2 Itemized Parts List

40

Advertising