ARB RD136 User Manual

Page 3

Advertising
background image

Table of Contents:

1

1 Introduction

3

1.1 Pre-Installation Preparation

3

1.2 Tool-Kit Recommendations

4

2 Removing the Existing Differential

5

2.1 Vehicle Support

5

2.2 Differential Fluid Drain

5

2.3 Removing the Axles

5

2.4 Marking the Bearing Caps

6

2.5 Checking the Current Backlash Amount

7

2.6 Removing the Differential Carrier

8

2.7 Use of the Thrust Block

8

3 Installing the Air Locker

9

3.1 Mounting the Ring Gear

9

3.2 Installing the Carrier Bearings

11

3.3 Drilling and Tapping the Bulkhead Port

12

3.4 Final Air Locker Assembly

14

3.5 Checking the Backlash

15

3.6 Installing the Seal Housing

16

3.7 Setting up the Bulkhead Fitting

17

3.8 Profiling the Seal Housing Tube

20

3.9 Bench Testing the Air Locker

24

3.10 Reinstalling the Differential & Axles

25

4 Installing the Air System

26

4.1 Mounting the Solenoid

26

4.2 Running & Securing the Air Line

28

4.3 Connection to the Bulkhead Fitting

29

5 Mounting & Connecting the Electrical System

31

5.1 Mounting the Actuator Switch(es)

31

5.2 Wiring the Actuator System

32

6 Testing & Final Assembly

35

6.1 Leak Testing

35

6.2 Testing the Air Locker Actuation

35

6.3 Filling the Differential

36

6.4 Post-Installation Check List

37

7 Parts List

39

7.1 Exploded Assembly Diagram

39

7.2 Itemized Parts List

40

Advertising