Start-up instructions, Shut-down instructions – L.B. White I-5 Infraconic User Manual

Page 11

Advertising
background image

Follow these start-up instruction steps for initial start-up
before building repopulation. For normal start-up, simply
turn the thermostatic head above room temperature.

1.

Open all gas supply valves to the heater(s) and check
for gas leaks at all connections using approved lead
detectors.

2.

Adjust the thermostatic head, located on the zone
control panel, to its maximum temperature setting.
See Fig. 7.

FIG. 7

3.

Fully depress the button on the safety control valve
while applying flame to the inner cone point. Keep
the button fully depressed for about 30 seconds until
the inner cone stays lit. Allow outer combustion cone
to heat up completely.See Fig.8.

FIG. 8

4.

Adjust the temperature by decreasing the setpoint on
the thermostatic head to the desired temperature.
The heater will cycle from low heat to high heat based
upon thermostatic head set point.

WARNING

Fire or Explosion Hazard

Do not force the safety control valve button.

Use only your hand to depress the gas control button.
Never use any tools.

If the button will not depress by normal hand
pressure, the control should be replaced by a
qualified service person.

Force or attempted repair may result in fire or
explosion, causing property damage, severe injury, or
death.

11

Start-Up Instructions

To reduce temperature, turn down the thermostatic control
on the zone panel.

To shut down the heaters for maintenance, cleaning or
service:

1.

Shut off all gas supply valves to the heaters.

2.

Allow heaters to burn off fuel gas remaining in the
gas supply line.

3.

Turn down the thermostatic head to minimum
setting.

Shut-Down Instructions

BUTTON ON VALVE

INNER CONE POINT

Advertising