Synergy 5051 - Front 3 Link Kit for Jeep TJ User Manual

Page 12

Advertising
background image

SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397


27. Measure center to center of the upper control arm bracket, cut and tack weld the tube

for the upper control arm and install in the vehicle.



TRACK BAR

28. Position the axle track bar mount on the axle. This bracket typically goes as far out to

the knuckle as possible. Usually up against the inner C weld. This height works well
for most high steer configurations, but can be trimmed to make it lower if needed.
Set the front to back rotation as far forward as possible without hitting the tie rod or
steering arm at full turn. Tack weld the bracket.

Advertising