13 lifting and tie down, Lifting, Tie down – JLG 1100SJP Operator Manual User Manual

Page 69: 13 lifting and tie down -15, Lifting -15 tie down -15

Advertising
background image

SECTION 4 - MACHINE OPERATION

3121255

– JLG Lift –

4-15

4.13 LIFTING AND TIE DOWN

See Figure 4-6. and Figure 4-7.

Lifting

1. Refer to the serial number plate, the General Specifica-

tions & Operator Maintenance section of this manual, or
weigh the individual unit to find out the Gross Vehicle
Weight.

2. Place the boom in the stowed position with the turntable

locked.

3. Remove all loose items from the machine.

4. Attach lifting device and equipment only to the desig-

nated lifting points.

5. Properly adjust the rigging to prevent damage to the

machine and so the machine remains level.

Tie Down

WHEN TRANSPORTING THE MACHINE, THE BOOM MUST BE FULLY
LOWERED INTO THE BOOM REST.

NOTE:

When loading the machine onto a trailer, it will be neces-
sary to rotate the turntable 180 degrees to provide better
weight distribution.

1. Place the boom in the stowed position with the turntable

locked.

2. Remove all loose items from the machine.

3. Secure the chassis and the platform using straps or

chains of adequate strength and attached to the desig-
nated tie down points.

Advertising
This manual is related to the following products: